Adobe Acrobat is required to view many of these documents.  The software is free;

simply click on the "Get Acrobat Reader" on the left to download.    

 

Cover, Acknowledgement and Disclaimer
Frequently Used MPO Terms and Abbreviations
Maps and Figures

 

PART 1

Introduction

 

 

  Chapter 1

Introduction

  Chapter 2

Planning Process

  Chapter 3

Goals, Objectives & Strategies

 

 

PART 2

Public Involvement

 

 

  Chapter 4

Citizen Participation

 

 

Part 3

Data Collection & Analysis

 

 

  Chapter 5

Travel Demand Model and Plan Data Sources

  Chapter 6

Socioeconomic Characteristics and Land Use

  Chapter 7

Transportation Demand Management

  Chapter 8

Congestion Management System

  Chapter 9

Public Transportation System

  Chapter 10

Bicycle & Pedestrian Facilities

  Chapter 11

Intermodal System

 

 

PART 4

2026 Financially Constrained Plan

 

 

  Chapter 12

Financial Resources

  Chapter 13

Projects List

  Chapter 14

Environmental Justice Assessment

  Chapter 15

Air Quality Conformity Determination

 

 

PART 5

Vision Plan

 

 

  Chapter 16

Vision Plan Projects List

 

 

Appendix

 

 

 

  A

Transportation Survey/Questionnaire

  B

Citizen Participation Summary

  C

Public Review Documentation

 

 

 

Back to Top

 

MAPS and FIGURES

 

 

  6-1

2000 Population Density by TAZ

  6-2

2026 Population Density by TAZ

  6-3

2000-2026 Change in Population Density by TAZ

  6-4

2000 Minority Population by Census Tract

  6-5

2000 Low Income Population by Census Tract

  6-6

2000 Employment Density by TAZ

  6-7

2026 Employment Density by TAZ

  6-8

2000-2026 Change in Employment Density by TAZ

  6-9

Future Land Use

  6-10

Financially Constrained Transportation Projects

  6-11

Future Land Use and Financially Constrained Transportation Projects

  8-1

CMS Roadway Network: Northwestern MPO Area

  8-2

CMS Roadway Network: Northeastern MPO Area

  8-3

CMS Roadway Network: Southeastern MPO Area

  8-4

CMS Roadway Network: Southwestern MPO Area

  8-5

CMS Roadway Network: Central Richmond

  8-6

Congested Corridors: 2003 Regional Travel Time and Speed Analysis

  8-7

Congested Corridors: 2000 Regional Travel Demand Model Analysis

  8-8

Comparison of V/C Ratio and Operating Speed Congested Locations

  8-9

Interstate Incident Hot Spots

  9-1

Existing Transit and Park and Ride Network

  10-1

Existing and Planned Bike Routes

  11-1

Intermodal Transportation Network

  13-1

Northwestern MPO Study Area: Existing & Committed Projects

  13-2

Northeastern MPO Study Area: Existing & Committed Projects

  13-3

Southeastern MPO Study Area: Existing & Committed Projects

  13-4

Southwestern MPO Study Area: Existing & Committed Projects

  13-5

Central Richmond MPO Study Area: Existing & Committed Projects

  13-6

Northwestern MPO Study Area: Proposed Projects

  13-7

Northeastern MPO Study Area: Proposed Projects

  13-8

Southeastern MPO Study Area: Proposed Projects

  13-9

Southwestern MPO Study Area: Proposed Projects

  13-10

Central Richmond MPO Study Area: Proposed Projects

  13-11

Non-Highway Proposed Projects

  14-1

Minority and Low-Income Population versus Automobile Ownership

 

Figure

 

  13-1

2026 LRTP Funding Methodology Summary

Back to Top